Getting Started

SMART HOME PROCESS

 

In order to convert your home or space into a smart home you have to plan efficiently the execution of smart home. You have to understand and be aware of the complete process of smart home installation so that you implement the system in a correct manner that will provide you the right value of the smart system and satisfy your actual needs that would improve your lifestyle.

1

Planning

The planning for smart home starts in the drawings phase or if the building is in the start of the civils engineering/construction phase. That applies if the smart system that would be implemented is the wired system type, if it is the wireless system then it can be installed any time when the building is completed.

2

Contact & Sign

In this step you have to contact, consult, and sign with us as we represent the installer company who will be responsible for the installation of the smart and low current systems. We will provide you with professional drawings for the required wirings for the systems, wiring technique, and all related systems requirements. Then signing a contract after the final approval on the drawings, quantities, and price.

3

Wirings Work

Start coordinating between us (the installer company) and the electrician to explain the wirings technique on the approved drawings under the supervision of the responsible engineer from us, to ensure that all the wirings be done in the correct manner. The responsible engineer will continuously visit the site to supervise the electrician’s work to check the work progress and make the required adjustments and give further instructions.

4

Tracing & Labeling

After all the wirings work has been finished and approved, we will send the technicians team to start working on site and begin tracing all the wires that have been implemented all over the house to make sure that all the wires are valid then label each wire with name of its location.

5

Smart Panel Prepartion

Start installing the backend devices in the smart panel to organize and connect the wires in the required device such as the lightings wires, the curtains wires, shutter wires, gate wires, data wires, and etc…

6

Installation & Programming

Ones the lightings fixtures are installed and operate in the sit, the programmers start program all the backend and frontend devices (such as the smart screens, smart switches, and sensors) to add them on the smart system, then install them in their physical locations based on the approved drawings once all the painting works have been done.

7

Training

Providing three days free training on the smart application so that you can make scenes and other adjustments that suit your changeable lifestyle by yourself without even calling us to come each time you want to change something. The smart home mobile application is user friendly everyone can use it and program all the needed sense without having any idea of programming.

8

Closing The project

Now it is the time to enjoy your living as everything is ready for you to experience the smart life you and your family.

Add your needs in your home and get an instant offer for your smart home